South Puget Sound Community College Building 22 Repairs
NEXUS was contracted by the Department of Enterprise Services on behalf of South Puget Sound Community College to determine the cause and extent of severe deterioration in the roof of Building 22. The extent of visible damage caused by water infiltration resulted in the team performing a Level II invasive forensic investigation.
Once the causes were determined, NEXUS designed and detailed the complete re-roof of the portion of the building experiencing water intrusion paying careful attention to the existing detailing and style of the building.
During construction, NEXUS performed regular site inspections and provided Construction Administration services to ensure the repairs were properly carried out per the design intent. We worked closely with the Contractor to address difficult or unexpected conditions.
During the course of this project, the College was so pleased with the results of the assessments and investigations, they engaged directly with NEXUS to perform assessments on two other problem areas that the College had previously been unable to solve.
Project Summary
Client/Owner:
South Puget Sound College
Services:
Forensic Investigation, Envelope Design, Bidding, Installation Observations
Location:
Olympia, WA